Scheduling Structure Monthly Report (Twisted Time Error)
Dear. Everybody
I have the mothly report time problem according to Monthes having 30 days or 31 days.
Time is twisted.
Did you have this problem??
If you have the solution, please give it to me.
Ref. Attach file.
Thanks.
Answers
Hello,
first of all, your attached file does not describe a problem regarding 30 or 31 days ?!
Your Log Configuration definition, the Data Collection, Storage Max should be larger than Min, then normally Bad data does not occur.
Which kind of log is it, direct or data source from controller, and if so which controller type ?
/Ronny
Hello,
Ensure you are using any interpolation with calculation on the END sample.
You try to get the 30 samples directly from the datadirect window for a monthly day smaples and check.