Upgrade to S.E 2.2 issue
I'm in the middle of upgrade to v 2.2 engineering .
I have older console database
As I understand the work flow is
1-bulk engineering
2-signal manager
3-Synchronize OE to operation engineering
My question is :
1-in bulk engineering , there is no legacy upgrade check box in S+ engineering V2.2 like V2.3
How it possible to compensate this function in V2.2
2-there are alot of mapping attributes in bulk engineering to be linked in My older db excel sheets columns , a lot of need mandatory attributes doesn't exist in db excel sheet ,especially hardware attributes
3-when I make IO import in bulk engineering the data doesn't trnsfer to signal manager
HINT : the engineering console is to be upgrade from V1.3 to V2.2 but the DB is from PGP .
thanks
I have older console database
As I understand the work flow is
1-bulk engineering
2-signal manager
3-Synchronize OE to operation engineering
My question is :
1-in bulk engineering , there is no legacy upgrade check box in S+ engineering V2.2 like V2.3
How it possible to compensate this function in V2.2
2-there are alot of mapping attributes in bulk engineering to be linked in My older db excel sheets columns , a lot of need mandatory attributes doesn't exist in db excel sheet ,especially hardware attributes
3-when I make IO import in bulk engineering the data doesn't trnsfer to signal manager
HINT : the engineering console is to be upgrade from V1.3 to V2.2 but the DB is from PGP .
thanks
Answers
Hi,
The following are the details for your questions:
For tag database,
1. Use of Bulk engineering is the only option.
2. The mandate ones are required to be mapped.
3. Upon synchronize tags, the data gets updated in SM.
For all other databases, you can use DB upgrade from Operations Engineering. or Import directly through Operations engineering after modifying the template to S+.
Refer to user manual for more details.
Regards,
Farooq
The following are the details for your questions:
For tag database,
1. Use of Bulk engineering is the only option.
2. The mandate ones are required to be mapped.
3. Upon synchronize tags, the data gets updated in SM.
For all other databases, you can use DB upgrade from Operations Engineering. or Import directly through Operations engineering after modifying the template to S+.
Refer to user manual for more details.
Regards,
Farooq
by alessandro.schivo Rank: 772 on 9/16/2020 1:55:36 AM | Like (0) | Report
1 - Since we don't have legacy upgrade functionality start from SPE 2.3 you have to manual map, and create your custom mapping, from excel column definition.
2 - Try to import the DB coming from PGP to a S+ 2.x version, then export and try to import via BET tool.
3- Try to do this after done point 2, if doesn't works contact support line.
BR