Bulk Data Manager for CHMI
Dear Sir,
We have encountered the issue of PLCConnect Server with the help of the ABB Local support. So we are up to collecting the data to the CHMI now we need to enclose it with Excel with the help of BDM. I have searched for the manuals but I didn't get anything as a getting started or a first-time base.
If available please share the document or any link which will be helpful for a beginner in BDM
Thanks in advance
Regards and stay safe
Amal
We have encountered the issue of PLCConnect Server with the help of the ABB Local support. So we are up to collecting the data to the CHMI now we need to enclose it with Excel with the help of BDM. I have searched for the manuals but I didn't get anything as a getting started or a first-time base.
If available please share the document or any link which will be helpful for a beginner in BDM
Thanks in advance
Regards and stay safe
Amal
Answers
Hi,
There is BDM2 option in 800xA v6.1 onwards. Functions of BDM2 and getting started of BDM is very well explained in BDM2 help menu.
Not sure CHMI have the same.
Here is a video from ABB Control Systems about CHMI BDM
https://www.youtube.com/watch?v=hgsv6...
There is BDM2 option in 800xA v6.1 onwards. Functions of BDM2 and getting started of BDM is very well explained in BDM2 help menu.
Not sure CHMI have the same.
Here is a video from ABB Control Systems about CHMI BDM
https://www.youtube.com/watch?v=hgsv6...